|
Surveying Phase:
If there are no plans of proposed site it will be necessary to carry out a survey of site. The survey req. will be determined by the design req. (Design phase can come before surveying phase and visa versa). Putt fantastic/ Client will arrange for survey. Once survey is completed it is the duty of the client to pay in full for this service unless client has agreed to the detailed design phase. We can also carry out the survey ourselves and make a nominal charge to cover our costs
Design Phase:
Putt fantastic will work with client to ascertain what the client would like to see in the finished design i.e. theming, structures, surface material, lighting, course difficulty level…From this information we can draw up a basic design. Conceptual drawings/ model/ design will then be prepared for client at cost. If you agree to use our assistance throughout the process then these plans would suffice
Planning permission: It will then be necessary to seek planning approval (unless of course this has already been approved or approval is not required). You will need an ordanance survey site plan outlining area to be used along with construction details. In this first meeting try and find out what special requirements may be needed. Try and get them on your side by mentioning that the course will benefit the community and that recycled materials will be used in part of the construction
Detailed design phase:
The client will be given a quote for detailed design (see architects fees) . Architects Fees @ cost (Putt fantastic will liase with architect to produce detailed plans and scope of work booklet on behalf of client). We will charge an hourly rate for our service
|